5. Build

The finished product remains the singularly most important thing we do. Alongside excellence in design, manufacture, and assembly, our structures are expertly planned to eradicate the risk of problems. Our in-house team retain structural control throughout the project with responsibility for the end-to-end process. Starting with transport, from quality checks and care taken before and during delivery to ensuring all vehicle loads mirror the building process. Packs are pre-slung before delivery, increasing lifting efficiency and reducing labour time needed for unloading.

We work with clients to establish the relevant crane and lifting plan on a project-specific basis. The lightweight nature of the Fusion solution means a small crane is able to lift our products, saving on costs and beneficial in projects where space is at a premium. Our in-house Appointed Person/s and Lifting Supervisors are able to plan for the ‘lifting in’ of ancillary items such as stairs, pods, etc.

Our highly-experienced erecting teams contain a supervisor and, where necessary, a slinger banksman or lifting supervisor.

We invest in bespoke training for our teams, focused on the erection of the Fusion system, Health & Safety, correct methodology, fixings, and processes needed to complete a successful build compliant with structural regulations. As part of our SCI structural accreditation, Fusion provides a sign-off on structures by a chartered structural engineer with as-built drawings and engineering calculations provided post-erection.

  • Our site managers will snag buildings with our erector team, and raise any items requiring attention to our Dalux portal accessible online or offline by our workforce on-site or by our office team.
  • Once all snags are closed out, the site manager will perform a final check before completing a full audit on a floor-by-floor basis to create an overall building sign-off leading to practical completion.
  • The site manager will complete the audit handing it over to the client’s site manager, who will perform their checks and sign off on our audit.

Our quality control team, the site managers, or the design and engineering department may identify non-conformities during the process. We record these and ensure they are signed off and corrected during the job.